11/20/15: Update on Warrenton-Wheeler Transmission Line Case

For those of you following the Warrenton-Wheeler transmission line, we have some good news. The Hearing Examiner has recommend the “C” route, which was Dominion’s (and our) preferred route, and the route that required the smallest amount of new right-of-way.

The hearing examiner turned down the SCC staff route recommendation, known as “Option A” which would have required a line straight across undeveloped parts of Fauquier County.

Great quote: “This attempt fails because its witness makes assertions unsupported by knowledge or analysis”.

We’ve posted the Examiner’s full report – Part I and Part II.