<title>Piedmont Environmental Council - pecva.org - In Depth Resources</title>
<link>http://www.pecva.org/anx/index.cfm/1,237,0,0,html</link>
<description>Piedmont Environmental Council has filed expert testimony with the Virginia State Corporation Commission in opposition to the Dominion &amp;amp; TrAILCo transmission line proposal.  The transmission line is simply not needed.</description>
<image>
<title>Piedmont Environmental Council - pecva.org</title>
<url>http://www.pecva.org/anx/img/logo.gif</url>
<link>http://www.pecva.org/anx/index.cfm/1,237,0,0,html</link>
</image>
<copyright>Piedmont Environmental Council</copyright>
<ttl>60</ttl>
<language>en</language>
<item>
<title>Photos and Artwork</title>
<description>Photos and artwork related to the transmission line proposal.</description>
<link>http://www.pecva.org/anx/index.cfm/1,237,913,-1,html</link>
</item>
<item>
<title>Expert Testimony of Mr. William Harvey</title>
<description>Mr. Harvey's mass appraisal analysis shows there will be substantial uncompensated damage to property owners all along the proposed transmission line route.</description>
<link>http://www.pecva.org/anx/index.cfm/1,341,897,-1,html</link>
</item>
<item>
<title>Expert Testimony of Ms. Kimberly Abe</title>
<description>Ms. Abe reviews the damages that the transmission lines could inflict on the cultural and scenic assets along the proposed routes, specifically in Fauquier County.</description>
<link>http://www.pecva.org/anx/index.cfm/1,341,896,-1,html</link>
</item>
<item>
<title>Expert Testimony of Ms. Jennifer Hallock</title>
<description>Ms. Hallock reviews the damages that the transmission lines could inflict on cultural and scenic assets along the proposed routes, specifically in Rappahannock County.</description>
<link>http://www.pecva.org/anx/index.cfm/1,341,895,-1,html</link>
</item>
<item>
<title>Expert Testimony of Mr. Gerry Sheerin</title>
<description>Mr. Sheerin confirms that undergrounding is technically feasible and used by utilities in the US and around the world in many cases including preservation of environmentally significant areas.</description>
<link>http://www.pecva.org/anx/index.cfm/1,341,894,-1,html</link>
</item>
<item>
<title>Expert Testimony of Dr. Kristina Hill</title>
<description>Dr. Hill, head of the Landscape Architecture program at University of Virginia School of Architecture, critiques the Dominion and Allegheny analysis of detrimental impact on scenic assets.</description>
<link>http://www.pecva.org/anx/index.cfm/1,341,893,-1,html</link>
</item>
<item>
<title>Expert Testimony of Dr. Dan Violette</title>
<description>Dr. Violette critiques Dominion's demand side reduction program and shows how Virginia could reduce energy use 10%, eliminating any need for additional transmission in Northern Virginia.</description>
<link>http://www.pecva.org/anx/index.cfm/1,341,892,-1,html</link>
</item>
<item>
<title>Expert Testimony of Dr. Benjamin Sovacool</title>
<description>Dr. Sovacool demonstrates that the addition of more high voltage transmission lines actually reduces the stability of the electric grid and would damage rather than enhance our national security.</description>
<link>http://www.pecva.org/anx/index.cfm/1,341,891,-1,html</link>
</item>
<item>
<title>Expert Testimony of Dr. Hyde Merrill</title>
<description>Dr. Hyde Merrill has a doctorate in electrical engineering from MIT and has been a power system planner for over 20 years. His review shows that the line is not needed and would only lead to increasing reliance on remote coal-fired power plants.</description>
<link>http://www.pecva.org/anx/index.cfm/1,341,890,-1,html</link>
</item>
<item>
<title>Expert Testimony of Mr. Watsun Randolph</title>
<description>PEC's GIS Specialist Watsun Randolph prepared maps which show the potential areas impacted by both proposed transmission line routes, including portions of Skyline Drive, Civil War battlefields, Historic Districts and Scenic Rivers.</description>
<link>http://www.pecva.org/anx/index.cfm/1,341,889,-1,html</link>
</item>
<item>
<title>Timeline for the 500-kV Transmission Line Proposal</title>
<description>The series of events surrounding the 500-kV Transmission Line Proposal.</description>
<link>http://www.pecva.org/anx/index.cfm/1,237,753,-1,html</link>
</item>
<item>
<title>What is NIETC?</title>
<description>'National Interest Electric Transmission Corridor'</description>
<link>http://www.pecva.org/anx/index.cfm/1,237,510,-1,html</link>
</item>
<item>
<title>What is PJM?</title>
<description>The regional transmission organization (RTO) responsible for coordinating the movement of electricity</description>
<link>http://www.pecva.org/anx/index.cfm/1,237,509,-1,html</link>
</item>
<item>
<title>Take a Stand Against the Line</title>
<description>The State Corporation Commission is considering whether to approve or deny the proposed transmission line. Get involved today!</description>
<link>http://www.pecva.org/anx/index.cfm/1,237,504,-1,html</link>